Results 1 to 8 of 8 for hamilton hall — Columbia Spectator

Refine search

Category

ARTICLE(8)

Year

1982(8)

Word count

Results 1 to 8 of 8 for hamilton hall

  1. 1.
    Columbia Daily Spectator 23 February 1982
    Construction on an outside elevator at Dodge Hall and on concrete wheelchair ramps connecting Butler Library to ...
  2. 2.
    Columbia Daily Spectator 14 July 1982
    Hamilton Hall, Low Library and most other Columbia edifices will ...
  3. 3.
    Columbia Daily Spectator 6 April 1982
    ... however, even though his new office will be in Hamilton Hall, he'd like to keep running his research lab.
  4. 4.
    Columbia Daily Spectator 5 November 1982
    ... and the British schools. About 75 students gathered in Hamilton Hall to hear Rosenthal describe the College's new agreement ...
  5. 5.
    Columbia Daily Spectator 2 April 1982
    ... fliers were run off and put in dorms and Hamilton Hall. It was advertised more than any previous election," ...
  6. 6.
    Columbia Daily Spectator 18 August 1982
    ... was captured by a group of angry students occupying Hamilton Hall. "How well I can remember him keeping company ...
  7. 7.
    Columbia Daily Spectator 19 May 1982
    ... manifested to the students beyond his work in 208 Hamilton or the university's dinner circuit. He was an unknown ...
  8. 8.
    Columbia Daily Spectator 8 September 1982
    ... New York to call for nuclear disarmanent. Back in Hamilton Hall, the College contemplated building a new dorm and ...